麻豆国产精品有码在线观看-麻豆国产免费影片-麻豆国产人免费人成免费视频-麻豆国产三级在线观看-国产入口在线观看-国产三及

首頁 產品展示>Perkins珀金斯850-854F柴油發動機T412827活塞總成

Perkins珀金斯850-854F柴油發動機T412827活塞總成

Perkins珀金斯850-854F柴油發動機T412827活塞總成供應商,Perkins珀金斯850-854F柴油發動機T412827活塞總成技術價格規格咨詢服務,Perkins珀金斯850-854F柴油發動機T412827活塞總成零配件供應,Perkins珀金斯850-854F柴油發動機T412827活塞總成售后服務中心,Perkins珀金斯850-854F柴油發動機T412827活塞總成,Perkins珀金斯850-854F柴油發動機T412827活塞總成詳細的技術參數,
產品咨詢

詳細描述

項目   零配件號碼    最新件號   描述  

    1   T412827    4   T412827    活塞及圈總成        

    (1) T418484    4   T418484    活塞及圈總成 -O/S       

    7   T412812    4   T412812    連桿總成         

    10  T412845    4   T412845    大頭軸承總成        

    (10)   T412807    4   T412807    連桿瓦總成 -U/S         

    (10)   T412850    4   T412850    連桿瓦總成 -U/S            

Cylinder block top face

To inspect

Operation 7-2

Inspect the cylinder block top face for cracks, damage and distortion in the same way as for the cylinder head,

refer to Operation 3-19.

If outside limit, renew the cylinder block.

Distortion mm (in)

Standard

Service limit

Less than 0,05 (0.002)

0,12 (0.005)

Note:   For emissions approved engines. If a new cylinder block is fitted, the engine should be tested on an

engine test brake and the fuel adjustment screw set. This procedures is only done by a Perkins approved

dealer. This will ensure that the engine will conform with emissions legislation.

2

1

A

84

Workshop Manual, TPD 1377E, issue 4

This document has been printed from SPI². Not for Resale


 

100 Series

8

Engine timing

8

Fuel injection pump timing

To check timing

Operation 8-1

Special requirements

Special tools

Description

Torque Nm (lbf ft) kgf m

Part number

Fuel pump spill pipe

21825680

Delivery valve holder

42 (31) 4,2

1  Set the piston for number 1 cylinder to TDC on the compression stroke. Turn the crankshaft counter-

clockwise a quarter of a revolution.

2  Disconnect or remove the ESOS, HP pipes and LP fuel inlet pipes from pump (A).

3  Ensure the throttle lever is held in the maximum fuel position after the procedure.

4  Remove the delivery valve holder for number 1 cylinder and remove the delivery valve. Store the delivery

valve in appropriate clean fuel until assembly.

Note:  The fuel pump may need to be moved to an upright position to remove and to fit the delivery valves.

Continued

Workshop Manual, TPD 1377E, issue 4

85

This document has been printed from SPI². Not for Resale


 

8

100 Series

5  Connect a suitable tank, which has a tap and contains 0,2 litres (¼ pint) of clean fuel, to the pump inlet.

6  Connect the fuel pump spill pipe to the delivery valve holder for number 1 cylinder. Put a suitable waste fuel

container below the pipe neck and open the tap, if correctly set fuel should flow (B).

Note:   The outlet from the tank should be approximately 152 mm (6 in) above the pump.

7  Turn the crankshaft slowly until the flow of fuel reduces to a drop which falls from pipe neck every 7-10

seconds. This is then the timing point.

8  Use the value shown by the timing mark (C1) with the injection timing tables given in "Injection timing" on

page 15.

1

Continued

86

Workshop Manual, TPD 1377E, issue 4

This document has been printed from SPI². Not for Resale


 

8

100 Series

9  If engine timing is incorrect adjust the thickness of shim (D2) to correct.

Note:  If the shim thickness is adjusted by 0,1 mm, the timing will alter by approximately one degree. An

increase in the number of shims will retard the timing, but if the number of shims are decreased this will

advance the timing.

10  Fit the delivery valve.

Notes:

Ensure that the delivery valve holder (D1) is tightened to the specified torque.

For emissions approved engines. If it is necessary to change the fuel injection pump, the fuel delivery must

be reset on a suitable test dynamometer with the new pump. The procedure above, on injection pump

timing explains how to change the timing.

When changing the timing, it is important that this procedure is done before the engine is tested on a

suitable dynamometer.

2

1

Workshop Manual, TPD 1377E, issue 4

87

This document has been printed from SPI². Not for Resale

 

免費熱線
400-082-9096?
整機銷售
0731-84424871? 18374999699
售后維修
0731-84424872? 15580888444
配件銷售
0731-84424873? 18274802060
手機端
微信公眾號
主站蜘蛛池模板: 亚洲欧美日本国产综合在线| 天天曰天天干| 久久午夜伦理| 成人在线网站| 一级毛片免费观看不卡视频| 日本精品久久久| 久久99精品波多结衣一区| 波多野结衣a∨免费观看| 亚洲四房| 色丁香婷婷| 国产成人福利免费视频| 一区二区三区不卡视频| 日韩视| 免费a网址| 国产 欧美 在线| 中文字幕在线播| 天天干天天爱天天操| 欧美视频导航| 国产一区二区三区影院| 97久久精品| 一级α片| 天天拍天天干| 人人看人人爽| 久久人人精品| 国内精品999| 波多野结衣家庭教师免费观看| 一区二区免费看| 偷窥wc美女毛茸茸视频| 日本免费黄色| 免费在线视频日本| 精品久久久久久蜜臂a∨| 国产黄网在线| 99在线视频观看| 在线观看网站黄| 五月天激情片| 日韩免费播放| 欧美视频一区在线| 老司机免费福利视频无毒午夜| 韩国三级日本三级香港三级| 成人性爱视频在线观看| 91在线中文字幕|