麻豆国产精品有码在线观看-麻豆国产免费影片-麻豆国产人免费人成免费视频-麻豆国产三级在线观看-国产入口在线观看-国产三及

首頁 產品展示>Perkins3012柴油發動機威爾遜P850E柴油發電機配件曲軸瓦

Perkins3012柴油發動機威爾遜P850E柴油發電機配件曲軸瓦

Perkins3012柴油發動機威爾遜P850E柴油發電機配件曲軸瓦供應商,Perkins3012柴油發動機威爾遜P850E柴油發電機配件曲軸瓦技術價格規格咨詢服務,Perkins3012柴油發動機威爾遜P850E柴油發電機配件曲軸瓦零配件供應,Perkins3012柴油發動機威爾遜P850E柴油發電機配件曲軸瓦售后服務中心,Perkins3012柴油發動機威爾遜P850E柴油發電機配件曲軸瓦,Perkins3012柴油發動機威爾遜P850E柴油發電機配件曲軸瓦詳細的技術參數,
產品咨詢

詳細描述

項目   零配件號碼    最近的部分號碼    描述      

    1   CV14877/1 Z   1   CV14877/1 Z   曲橋箱       

    11  KRP3106/010   1   KRP3106/010   曲軸瓦裝備 -U/S         

    11  KRP3106/020   1   KRP3106/020   曲軸瓦裝備 -U/S         

    11  KRP3106/030   1   KRP3106/030   曲軸瓦裝備 -U/S         

    11  KRP3106/040   1   KRP3106/040   曲軸瓦裝備 -U/S         

    11  KRP3106    1   KRP3106    曲軸瓦裝備       

    12  KRP3203/013   1   KRP3203/013   插入墊圈裝備 -O/S       

    12  KRP3203    1   KRP3203    止推片裝備       

    14  CV275  2   CV275  栓塞         

    24  CV9116 6   CV19408    噴射         

    26  ST44441    12  2314 C045  固定螺釘         

    27  ST43160    12  2134 A008  墊圈         

    31  CV1418 1   CV1418 板        

    32  CV20207    1   CV20207    切片密封墊的板          

    33  CV1420 1   CV1420 板        

    34  CV20208    1   CV68115    密封墊       

    35  ST44437    22  2314 C043  固定螺釘         

    36  ST20606    22  ST20606    墊圈         

    37  ST20133    1   ST20133I   栓塞         

    38  ST49891    1   ST49891    墊圈         

    39  ST45779    8   ST45779    合釘         

    40  ST20704    5   ST20704    栓塞         

    41  OE7669 4   OE7669 密封O型圈       

    42  CV13080    4   CV13080    栓塞         

    43  ST43324    4   ST43324    栓塞         

    44  ST20134    1   ST20134    栓塞         

    45  ST49206    1   ST49206    墊圈         

    46  CV1470 4   CV1470 線橋         

    47  CV7789 48  CV7789 圖釘         

    48  CV7790 32  CV7790 圖釘         

    49  CV7788 80  CV7788 螺帽         

    50  OE46176    80  OE46176I   墊圈         

    51  CV2910 1   CV2910 栓塞         

    52  CV20002    2   CV20002    固定螺釘         

    53  ST43333    1   ST43333    栓塞         

    54  ST43330    1   ST43330    栓塞         

    55  OE1647 1   OE1647 蓋        

    56  CV20236    1   CV20236I   密封墊       

    57  ST43556    2   ST43556    螺拴         

    58  2134 A010  2   2134 A010  墊圈         

    59  ST20103    1   ST46078I   栓塞         

    60  ST49853    1   ST49853    墊圈         

    61  ST20104    1   ST20104    栓塞         

    62  ST49891    1   ST49891    墊圈         

    63  ST20105    1   ST20105    栓塞         

    64  ST20107    1   ST20107    栓塞         

    65  ST49209    1   ST49209    墊圈  

    項目   零配件號碼    最近的部分號碼    描述      

    2      7       帽        

    3   CV270  1   CV270  合釘         

    4   CV278  8   CV24546    固定螺釘         

    5   ST20707    1   ST20707    栓塞         

    6   ST43706    8   ST43706    螺拴         

    7   ST43060    8   2131 A016  墊圈         

    8   ST43330    12  ST43330    栓塞         

    9   ST43326    10  ST43326    栓塞         

    10  ST33606    4   ST33606    栓塞         

    13  CV274  17  CV274  凸輪軸襯套       

    15  ST43322    20  ST43322    栓塞         

    16  ST43326    1   ST43326    栓塞         

    17  ST43657    6   ST43657    螺拴         

    18  CV9171 6   CV9171 墊圈         

    20  CV11572    1   CV11572    凸輪軸襯套       

    21  ST43328    2   ST43328    栓塞         

    22  ST20701    29  ST20701    栓塞         

    23  CV1271 12     固定螺釘         

    25  ST20702    2   ST20702    栓塞         

    28  ST43324    8   ST43324    栓塞         

    29  ST46076    1   ST46076I   栓塞         

    30  ST49851    1   ST49851    墊圈

    項目   零配件號碼    最近的部分號碼    描述      

    2      1      止推片       

    3      1      止推片       

    4      1      止推片       

    5      1      止推片       

    項目   零配件號碼    最近的部分號碼    描述      

       ST20139    2   ST20139    栓塞         

       ST49860    2   ST49860    墊圈         

    1   CV5519 1      室        

    3   CV2124 8   CV2124 圖釘         

    4   ST44605    8   2318 A208  公制的螺帽       

    5   ST43160    8   2134 A008  墊圈         

    6   ST43056    8   2131 A008  墊圈         

    7   CV7210/1   1   CV7210/1   冷卻器回廊裝備          

    7   CV7210/1   1   CV7210/1   冷卻器回廊裝備          

    7   CV7210 1   CV7210/1   冷卻器回廊       

    10  CV20232    4   CV72181    密封墊       

    11  ST43502    48  ST43502    螺拴         

    12  ST43160    48  2134 A008  墊圈         

    13  ST43056    48  2131 A008  墊圈         

    14  CV7211/1   1   CV7211/1   冷卻器回廊裝備          

    14  CV7211/1   1   CV7211/1   冷卻器回廊裝備          

    14  CV7211 1   CV7211/1   冷卻器回廊       

    17  CV5595 1   CV5595 室        

    項目   零配件號碼    最近的部分號碼    描述      

    1   CV13835    1   CV24559    曲軸裝備  

    項目   零配件號碼    最近的部分號碼    描述      

    2      1      曲軸         

    3   CV13458    6   CV13458    栓塞         

    4   CV1209 6   CV1209 扣環         

    5   CV13830    3   CV13830    栓塞         

    6   ST10609    6   ST10609    密封O型圈

    項目   零配件號碼    最近的部分號碼    描述      

    1   CV7926 1      曲軸皮帶輪       

    3   CV12174    12  CV12174    螺拴         

    4   2134 A012  12  2134 A012  墊圈  

All rods which have the same letter have weights

which vary by less than 0,10 kg (0.22 lb) and rods

which have the same letter and number have weights  

which vary by less than 0,025 kg (0.055 lb).  If a

connecting rod is to be renewed, it important that the

new connecting rod is of the same group as the

original connecting rod.

The groups for the weights are as follows:

Y1 4,150 kg  to  4,175 kg (9.149  to  9.204 lb)

Y2 4,175 kg  to  4,200 kg (9.204  to  9.259 lb)

Y3 4,200 kg  to  4,225 kg (9.259  to  9.315 lb)

Y4 4,225 kg  to  4,250 kg (9.315  to  9.370 lb)

Z1 4.250 kg  to  4,275 kg (9.370  to  9.425 lb)

Z2 4.275 kg  to  4,300 kg (9.425  to  9.480 lb)

Z3 4.300 kg  to  4,325 kg (9.480  to  9.535 lb)

Z4 4.325 kg  to  4,350 kg (9.535  to  9.590 lb)

A1 4,350 kg  to  4.375 kg (9.590  to  9.645 lb)

A2 4,375 kg  to  4.400 kg (9.645  to  9.700 lb)

A3 4,400 kg  to  4.425 kg (9.700  to  9.755 lb)

A4 4,425 kg  to  4.450 kg (9.755  to  9.811 lb)

B1 4,450 kg  to  4,475 kg (9.811  to  9.866 lb)

B2 4,475 kg  to  4,500 kg (9.866  to  9.921 lb)

B3 4,500 kg  to  4,525 kg (9.921  to  9.976 lb)


A


139


B4 4,525 kg  to  4,550 kg (9.976  to 10.031 lb)

C1 4,550 kg  to  4,575 kg (10.031  to 10.086 lb)

C2 4,575 kg  to  4,600 kg (10.086  to 10.141 lb)

C3 4,600 kg  to  4,625 kg (10.141  to 10.196 lb)

C4 4,625 kg  to  4,650 kg (10.196  to 10.252 lb)

D1 4,650 kg  to  4,675 kg (10.252  to 10.307 lb)

D2 4,675 kg  to  4,700 kg (10.307  to 10.362 lb)

D3 4,700 kg  to  4,725 kg (10.362  to 10.417 lb)

D4 4,725 kg  to  4,750 kg (10.417  to 10.472 lb)

E1 4,750 kg  to  4,775 kg (10.472  to 10.527 lb)

E2 4,775 kg  to  4,800 kg (10.527  to 10.582 lb)

E3 4,800 kg  to  4,825 kg (10.582  to 10.637 lb)

E4 4,825 kg  to  4,850 kg (10.637  to 10.692)


The grades of the connecting rods fitted within a bank

of cylinders must all be the same; for example, ’A’

bank - all grade B1.  A different grade of connecting

rod may be fitted in the other bank of cylinders, but

they must also be all the same within the bank; for

example, ’B’ bank - all C3.

The pistons are made of an aluminium alloy which

contains a high percentage of silicon. The tops of the

pistons have special toroidal combustion chambers to

give an efficient mix of fuel and air. Each of the early

pistons (A) has three compression rings and one oil

control ring.  The new pistons have two compression

rings and one oil control ring.  The top compression

rings of both types of pistons are wedge shaped and

their grooves  are machined in hard metal inserts to

reduce the wear of the grooves.

Each 4-ring piston is tin plated on all the surfaces after

it has been manufactured, except the bore for the

gudgeon pin.

A 3-ring piston is tin plated below the top ring, except

the bore for the gudgeon pin, and the toroidal

combustion chamber is  hard anodised. The axial

location of the fully floating gudgeon pin is controlled

by the circlips in the bore.



62


Perkins  Engines Company Limited


This document has been printed from SPI². Not for Resale


Big end bearings


13



To remove and to fit

Special tools:

Guide pin, 21825 843


13-1


To remove

1 Disconnect the batteries, stop the supply of the fuel

and drain the engine lubricating oil from the sump.

2 Remove the lubricating oil sump, operation 19-1 or,

for new engines, operation 19-5.

3  For early engines, remove the sump adaptor,

operation 19-3.

4  If necessary, release the bolts which retain the

lubricating oil pump and remove the lubricating oil

pump, operation 19-7.

5  Turn the crankshaft until the selected assembly of

the piston and connecting rod is at the bottom of its

stroke and remove the nuts of the big end bolts.

Remove the bearing cap and fit the guide pin, 21825

843, on to one of the big end bolts. Push carefully the

assembly up the cylinder bore just enough to allow

access to the upper half bearing.

Caution: There is a danger that the connecting rod

could fall against the cylinder liner and break it. The

use of the guide pin, 21825 843, ensures that this

damage cannot occur.

6 Remove the two half bearings from the connecting

rod and keep them together.  Ensure that they can be

fitted in their original positions, if necessary.

To fit

1  Clean the connecting rod and the cap.

Caution: Renew the half bearings as a set of two if

there is doubt that they are acceptable for a complete

period of service.  If it is not necessary to renew the

half bearings, ensure that they are fitted in their

original positions.

2  Clean the upper half bearing and lubricate the

bearing surface, the crank pin and the bolts and nuts

with clean engine lubricating oil.  It is recommended

that new bolts and nuts are used. When the bolts are

fitted, press carefully each bolt into the connecting rod

until the bolt head is fully against the machined face

of the connec ting rod.



Perkins Engines Company Limited


63


This document has been printed from SPI². Not for Resale


13


3  Fit the off-centre upper half bearing to the

connecting rod.  Ensure that the edges of the half

bearing are aligned with the edges of the parent bore

of the connecting rod.  When it is fitted correctly, the

half bearing does not protrude ov er the chamfer on

the edge of the bore.

4 Use the guide pin, 21825 843, to pull the assembly

of the connecting rod and the piston down the bore

until the big end bearing is fitted on the crank pin.

Remove the guide pin from the connecting rod.

5  Clean the off-centre lower half bearing and fit it to

the cap. Ensure that the edges of the half bearing are

aligned with the edges of the parent bore of the


A


114


connecting rod.  When it is fitted correctly, the half

bearing does not protrude over the chamfer on the

edge of the bore.  Lubricate the bearing surface and

the crank pin. Ensure that the letters/numbers, which

are stamped on each bearing cap to give its

relationship, match the letters/numbers which are

stamped on the connecting rod, and fit the bearing

cap onto the bolts of the big end.  Ensure that the

connecting rod does not fall from the crank pin.

6  For engines fitted with connecting rod bolts which

have a ’D’ or square-shaped head, fit and tighten the

four nuts of the connecting rod, in the sequence

shown (B), to 20 Nm (15 lbf ft) and then to 45 Nm (33

lbf ft). The final operation is to tighten them to 70 Nm

(52 lbf ft). During the operation to tighten the bolts, if

the tension on the torque wrench reduces suddenly,

remove the bolt and fit a new bolt and nut.

For early engines, those with round headed

connecting rod bolts, proceed as follows: fit and

tighten the four nuts of the connecting rod, in the

sequence shown (B) to 20 Nm (14 lbf ft) and then to

40 Nm (28 lbf ft). The final operation is to tighten them

to 60 Nm (42 lbf ft). During the operation to tighten the

bolts, if the tension on the torque wrench reduc es

suddenly, remove the bolt and renew the bolt and its

nut.

Caution: Round headed connecting rod bolts are

NOT interchangeable with the later ty pes. Connecting

rods must be fitted with only the type of bolts which

were originally used.

7  Ensure that the crankshaft turns  freely.

8 Fit the lubricating oil pump if relevant, operation 19-

7.

9  For early engines, fit the sump adaptor, operation

19-3.


10  Fit the lubricating oil sump, operation 19-1 or, for

new engines, operation 19-5.

11  Fill the sump to the correct level with engine

lubricating oil and connect the supply of the  fuel.

12  Connect the batteries.

To inspect                               13-2

1  Check the bearings and the crank pin for wear or

other damage.



64


Perkins  Engines Company Limited


This document has been printed from SPI². Not for Resale


Piston and connecting rod assembly


13



To remove and to fit

Special tools:

Guide pin, 21825 843

Retainers, 21825 844


13-3


To remove

1 Disconnect the batteries, stop the supply of the fuel

and drain the engine lubricating oil from the sump

2  Drain the cooling system.

3 Remove the relevant cylinder head, operation 12-9.

4 Remove the lubricating oil sump, operation 19-1 or,

for new engines, operation 19-5.

5  For early engines, remove the sump adaptor,

operation 19-3.

6  If necessary, release the bolts which retain the

lubricating oil pump and remove the lubricating oil

pump, operation 19-7.

7  Hold the relevant cylinder liner with the retainers,

21825 844, as necessary.

8  Turn the crankshaft until the selected assembly  of

the piston and connecting rod is at the bottom of its

stroke and remove the nuts of the big end bolts.

Remove the bearing cap and fit the guide pin, 21825

843, on to one of the big end bolts. Push carefully the

assembly out through the top of the cylinder.

Caution: There is a danger that the connecting rod

could fall against the cylinder liner and break it. The

use of the guide pin, 21825 843, ensures that this

damage cannot occur.



Perkins Engines Company Limited


65


This document has been printed from SPI². Not for Resale


13


To fit


Special tools:

Height gauge, 21825 782

Guide pin, 21825 843

Retainer, 21825 844

Piston ring compressor, 21825 845



1 Turn the crankshaft until the relevant crank pin is at

BDC. Check that the upper half bearing of the big end

is in its position on the connecting rod.  Set the gaps

of the piston rings in the positions shown (A) if the

pistons have four rings.  If the pistons have three

rings, set the gaps as shown (B).  Apply oil to the

crank pin, the upper half bearing and the piston, and

slide the piston ring compressor, 21825 845, over the

lower end of the piston with the tapered section

against the piston rings. Fit the guide pin, 21825 843,

onto one of the bolts of the big end bearing (C).  It is

recommended that new bolts and nuts are used.

When the bolts are fitted, press carefully each bolt

into the connecting rod until the bolt head is  fully

against the machined face of the connecting rod.

Caution: There is a danger that the connecting rod

could fall against the cylinder liner and break it. The

use of the guide pin, 21825 843, ensures that this

damage cannot occur.

Caution: If the old bolts and nuts have been used for

the connecting rod, they must first be inspected, for

signs of distortion of the threads, for stress, or for

indications of stretch, etc.  Renew all bolts and nuts

that could be defective.

2  Fit carefully the assembly of the piston and the

connecting rod into its liner.  Ensure that the cutout in

the lower wall of the piston is in the correct

relationship to the piston cooling jet assembly.  Use

the guide pin to pull the assembly through the piston

ring compres sor and into the cylinder liner. Ensure

that the piston ring compressor is held, and does not

fall when it becomes free.  Continue to pull the

assembly until the big end bearing is fitted on the

crank pin.  If the piston and the connecting rod are

assembled correctly, the chamfer on the edge of the

bore in the big end is toward the crankshaft web.

Ensure that there is clearanc e between the piston and

the cooling jet.

Caution: During this operation, do not damage the

bearing surfaces of the crank pin and the half

bearings of the big end.


A

B


12

13



A


194



66


Perkins  Engines Company Limited


This document has been printed from SPI². Not for Resale


13


Caution: If a retainer, 21825 844, is removed to give

a clearance for the piston ring compressor, it must be

fitted again for each operation before the crankshaft is

turned.

3  Fit and tighten the four nuts of the connecting rod,

in the sequence shown (A) to 20 Nm (15 lbf ft) and

then to 40 Nm (30 lbf ft).  The final operation is to

tighten them to 60 Nm (44 lbf ft).  It is recommended

that the new bolts and nuts are used. Lubricate lightly

the threads and the contact faces before they are

fitted to the connecting rods.

Caution: The nuts of the connecting rod should be

tightened gradually and evenly. During this operation

avoid rapid or sudden movements of the torque

wrench.

4  Ensure that the crankshaft turns freely .

5  Check the end-float of the connecting rods with a

dial test indicator, as shown (B).  The clearance for

each set of two connecting rods, between the big

ends and their relevant crankshaft webs, must be

0,20 mm to 0,40 mm (0.008 to 0.016 in).

6 Repeat the procedure for each assembly of a piston

and a connec ting rod.

Check the clearance between the top face of the

piston and the top face of the cylinder bank as follows:

7  Put the setting plate of the height gauge, 21825

782, on a clean s urface which is machined and put

the base of the tool over the setting plate.  Align the

button of the dial gauge to make contact with the

centre of the plate.  Set the dial gauge to zero and

tighten the locking screw.

8  Turn the crankshaft until one of the pistons  is  

almost at the top of its cylinder and move the setting

plate to the top face of the piston.  Put the base of the

tool on the top face of the cylinder block, as shown

(C).

9 Continue to turn slowly  the c rankshaft, to allow the

piston to pass TDC. As the piston passes  TDC, make

a note of the reading on the dial gauge; the maximum

deflection of the pointer gives a minimum reading to

indicate the clearance between the top face of the

piston and the top face of the cylinder bank.  The

permis sible clearance is from 0,31 to 0,38 mm (0.012

to 0.015 in).  For engines manufactured from July

1998, fitted with piston number CV66887, the

permis sible clearance is from 0,31 to 0,75 mm (0.012

to 0.029 in).


A

B


114

197



B


198



Perkins Engines Company Limited


67


This document has been printed from SPI². Not for Resale


13

10  Check the clearance of each piston in the

cylinders of ’A’ bank, then turn the crankcase until the

cylinders of ’B’ bank are vertical.  Repeat the

procedure to check the clearance of each piston in the

cylinders of ’B’ bank.

Caution: If not enough clearance is shown on the

dial gauge, the top face of the piston must be

machined to remove the minimum amount of material

which is  necessary to give the correct clearance. This

will not be neces sary for engines manufactured after

July 1998 fitted with the piston XCV66887.

11  Fit the cylinder head, operation 12-9.

12  Fit the lubricating oil pump if relevant, operation

19-7.

13  For early engines, fit the sump adaptor, operation

19-3.

14  Fit the lubricating oil sump, operation 19-1 or, for

new engines, operation 19-5.

15  Fill the sump to the correct level with engine

lubricating oil and connect the supply of the fuel.

16  Fill the cooling system.

17  Connect the batteries.

To dismantle and to assemble          13-4

To dismantle

1 Remove the circlips which retain the gudgeon pin.

2  Push the gudgeon pin out by hand to release the

connecting rod.  If the gudgeon pin is tight, heat the

piston in a tank of warm water.  Keep together each

assembly.

To assemble

Before the connecting rod is assembled, check for

dirt and debris in the passage for the lubricating oil

and clean the pas sage with compressed air.

1  The gudgeon pin should be a push fit at 20°C

(68°F).  If it is tight in its bore in the piston, heat the

piston in a tank of warm water.  Remove the piston

from the water and use a clean and suitable rag to dry

the bore for the gudgeon pin.  Fit one of the circlips

into its groove in the bore.

2 Give an applic ation of clean engine lubric ating oil to

the small end bush, the gudgeon pin and the bore for

the gudgeon pin.



68


Perkins  Engines Company Limited


This document has been printed from SPI². Not for Resale

 

免費熱線
400-082-9096?
整機銷售
0731-84424871? 18374999699
售后維修
0731-84424872? 15580888444
配件銷售
0731-84424873? 18274802060
手機端
微信公眾號
主站蜘蛛池模板: 日本中文字幕高清| 搡老女人免费视频| 黄页网站在线播放| 99精品国产免费久久国语| 免费一级a毛片| 国产黄网站| 亚洲精品tv久久久久久久久久| 欧美性猛交99久久久久99| 黄色爱爱视频| 大又大粗又爽又黄少妇毛片| 曰b免费视频| 色婷婷激情| 欧美日韩一区在线观看| 黄页网站在线观看免费| 古装一级淫片a免费播放口| 337p日本亚洲| 色视频在线观看完整免费版| 毛片黄在线看免费| 国内精品久久久久鸭| v天堂在线观看| 在线韩日| 无码免费一区二区三区免费播放| 久久99九九| 国产经典自拍| 99久久综合精品国产| 亚洲一区二区三区在线免费观看 | 国产一级视频播放| 在线一区国产| 婷婷综合网站| 日本中文字幕高清| 欧美激情在线一区二区三区 | 欧美一二三区视频| 久久国产偷| 国内自拍视频在线播放| 成年人黄色在线观看| 69交性视频| 亚洲伊人久久网| 天天干天天玩| 日日夜夜噜| 青草青在线免费视频| 鲁鲁在线观看|